The consulting team of Southern Ontario Consultancy participated in hundreds of projects through their career and have prolonged experience in the field of civil and geotechnical engineering and in projects management and planning. Here are some of the featured projects they were involved in. The projects are chosen randomly.

 


Whitehorse Correctional Center

Whitehorse Correctional Center

Owner: Yukon Government-Ministry of Justice

Main Consultant: DGBK Architect

Contractor: Dominium Construction

Location: Whitehorse City-Yukon, Canada

Design-Bid-Build Project, LEED silver standards,  Budget $75 Millions, Construction Management, 2009-2012; 7,700 M2 facility with a capacity of 190 adult both male and female inmates as well as remanded and convicted inmates.

 


 

chennaiChennai Metro Stations

Diaphragm wall analysis, slurry trench stability, methodology and technical advice, 2011-2013

With HLG STFA Soil Group

Location: Chennai – India Client: Gammon India Limited

Main Consultant: Parsons Brinckerhoff

Contract Date: 04-December-2011 Completion Date: 31-July-2013 Project

Diaphragm Wall Length : 1,266 m, Retaining Depth : 25 m, Thickness : 1.00 m

 


Rumaila gasRumaila Gas Turbines Power Plant

Civil/structural design of the project, 2011-2013

Contractor: Hyundai Engineering Company – Power Engineering World Group

Location: Basrah – Iraq

Main Consultant: Independent Consultant Services

Five units SGT 4000F with BoP

 

 

 


 

Mosul Dammosul dam

Analysis of monitoring system and evaluation of dam stability, 2002

With Water resources society of Iraq

One of the largest earth dams in the middle east

Location: Mosul, Iraq

Dam Height 113m, Width:400m, Length: 3400m


 

KataraKatara Hotel

Analysis Design and Methodologies for Shoring, Excavation and Pile Foundation

With HLG STFA Soil Group

Location: Lusail, Qatar

Client: Katara Hospitality

Main Consultant: Kling Consult

Shoring: Anchored and Strutted Secant Piles

Shoring length: 465m length, Retaining Depth: 9m

Piling:1m diameter piles, Pile lengths: 8.7m to 31m , Quantity: 2067piles


F.H. Collins Secondary School

F.H. Collins Secondary School

Owner: Yukon Government-Ministry of Education

Bridging Consultant: BarrRyder Architects and Interior Designers

Design-Build Contractor: Stantec and Clark Builders

Location: Whitehorse City-Yukon, Canada

Design-Bid Project, LEED silver standards, Budget $50 Millions, 2012

-2016; 0ver 7,500M2 and will accommodate up to 750 students.


 

 

Water treatmentStandard Design of Water Treatment Projects

Civil/Structural design of 1,000, 2000, 4000 m3 water treatment plants in Iraq, 2005-2007

Location: Iraq (Different locations)

Client: PARSONS/CH2MHILL JV

Main Consultant: MWH

Sub Consultant: Consulting Engineering Bureau – University of Baghdad

Civil/structural design of process and non-process facilities

 


 

 

Guggenheim Abu Dhabi MuseumGuggenheim

Design and Technical Advice for Pile Foundations and Soil Improvement works, 2010-2011

With HLG STFA Soil Group

Location: Abu Dhabi, UAE

Client: TDIC

Main Consultant: Arup Gulf

Piling: Diameters: 1000mm – 1200mm, Quantity: 1,511 nos., Pile Length: 13.00m – 35.00m, Total Pile Length: 40,000m

Earth Works: Bulk Excavation: 340,000m3

 


 

 

IBQIBQ Headquarters Building

Design of IBQ headquarters building, 2007-2008

Location: Doha, Qatar

Client: IBQ

Consultant: Yamasaki Associates

Total number of stories = 33, total building height = 190m